Serving Kalamazoo, Battle Creek, Grand Rapids & All Surrounding Areas
Click on a photo to enlarge.
Take a look at another system installed with and interior aesthetic package. This system has (2) extraction points. The schedule 40 piping is ran to the garage where the fan is located and vented through the roof.
Main extraction point of a multi extraction point radon system.
This is an good example of crack sealing completed on a radon mitigation project. It is important to seal all areas of the concrete slab and/or foundation to seal off radon entry points.
Dual suction points. One for the concrete slab and the other for the concrete addition crawlspace.
Here is a before and after photoshoot detailing a radon extraction point installed by ALS Property Associates, Inc. in Otsego, MI. This system ended up having (3) radon extraction points.
our service area